2016 June Nome Trip
Revision as of 13:16, 26 May 2016 by imported>Bob
On the To Do list:
- Anvil City School station needs a propeller for the 05103
- Switch the current SR50 to a SR50A and give Bill the old SR50.
- Anvil logger could be upgraded to pakbus like we did at Skookum
- K2 site download the storage module.
- Teller
- Stream measurement
- put up 3m tripod
- move surface water sensors to their own logger
- download and shutdown snow temperature logger
- disassemble and bring back to town
- download data from hill top
- download data from gaging station
- Blueberry site
- can we take down the tower, removing the lowest section?... might that be a three person job?
- Kougarok 10m Met
- snow sensor?
- shorten tower?
- check out battery data