2016 NGEE September Nome Trip
Revision as of 18:34, 30 August 2016 by 137.229.92.213 (talk)
Contents
Teller Bottom @ TL_DS_1
To Do:
- Get SRS sensors running
- Get Thermal Conductivity sensors running
- Jumper for batteries
- Pack up Surface Water Station for winter
- Duct seal up all instrument box holes
- Final Discharge Measurement of season
In Nome Storage:
- jumpers for last battery
- soil sampling cylinders for soil pit
- Cable spools for Pressure transducers
At Site
- duct seal for all connections
- soil pit sensors in large actionpacker
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
Left to fix
- Decagon SRS sensors... test again in Fairbanks
- Thermal Conductivity sensors... figure out their deal...
- Review fieldbook
Teller Top @ TL_IS5
Remaining To Do for fall
- Bring out a charge controller for solar panel
- soil samples from soil pit
- soil pit sensors are in a large actionpacker next to tower.
Kougarok M64
- Add ground control survey point if permitted
Skookum Pass
- Add Satellite Components
Kougarok Old Sites
- Download data over the radio network
Council Old Sites
- Look for camera at Blueberry site