NGEE Nome April 2016 pt 1 Bonus Notes
Revision as of 08:42, 30 March 2016 by imported>Bob
- pipe
- 2 pieces of 5ft w/
- 6pcs -- 1.5" x 1/4-20 bolts for
- should refresh on the pin outs for the iridium.
Station Tripod setup:
- survey tripod
- 1 pcs 1/2 height unistrut bolted to survey tripod using:
- 2 pcs 1/4" fender washer
- 2pcs 1/4" unistrut nut deals
- 2 pcs 1.5" x 1/4-20 bolts
- 1" horizontal pipe cut to 2 5' sections and coupled in middle
- secure horizontal pipe to unistrut using two u-bolts
To buy for tripod station:
- 2 pcs 10' x 1" stick of conduit for horizontals
- http://www.lowes.com/pd_72715-1792-101568___?productId=3129555&pl=1&Ntt=1%22+emt+conduit
- let me see if I can find a substitute for this.
- 2 pcs 10' x 3/4" metal conduit for verticals
- 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred)
- http://www.lowes.com/pd_446093-37672-320876___?productId=4406795&pl=1&Ntt=stainless+steel+u-bolt (this is the size... I know they are sold cheaper than this...)
- 6 pcs -- 1.5" x 1/4-20 bolts
Prep work still to go:
- finalize survival stuff