Second Trip:
August 11 - 19
- Look for acme tools drilling jig maybe shipped 7/1.
Second Trip To Do List:
- @ Teller
- Lower Station turn into full met 3m tripod located closer to shrubs
- soil pit
- 1.5m soil temps?
- snow
- radiation
- probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)
- airtemp & Precip
- 3m anemometer
- use self tapping screw to keep animals from removing precip bucket lid.
- Upper station
- soil pit in the low area
- new solar panel
- real batteries in a battery box
- super animal protection.
- Lower Station turn into full met 3m tripod located closer to shrubs
- Existing Sites @ Kougarok
- Remove lowest section of K-met Tower?
- Level radiometers
- level precip buckets
- general sensor refresh
- Existing Sites @ Council
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- level precip buckets
- general sensor refresh
- spend one or two nights with Mike Murphy to reduce travel times?
- radiometer setup to Grid site
- put in ground control point
New ~mile 60 Kougarok site
- radiation
- heat flux
- put in ground control point