2016 NGEE August Nome Trip

From IARC 207 Wiki
Revision as of 12:57, 20 July 2016 by imported>Bob
Jump to navigation Jump to search

Second Trip:

August 11 - 19

  • Look for acme tools drilling jig maybe shipped 7/1.

Second Trip To Do List:

  • @ Teller
    • Lower Station turn into full met 3m tripod located closer to shrubs
      • soil pit
      • 1.5m soil temps?
      • snow
      • radiation
      • probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)
      • airtemp & Precip
      • 3m anemometer
      • use self tapping screw to keep animals from removing precip bucket lid.
    • Upper station
      • soil pit in the low area
      • new solar panel
      • real batteries in a battery box
      • super animal protection.
  • @ Kougraok M64
    • if we get permission then site at the top perhaps?
  • Existing Sites @ Kougarok
    • Remove lowest section of K-met Tower?
    • Level radiometers
    • level precip buckets
    • general sensor refresh
  • Existing Sites @ Council
    • Remove lowest section of Tower? @ blueberry hill
    • Level radiometers
    • level precip buckets
    • general sensor refresh
    • spend one or two nights with Mike Murphy to reduce travel times?
    • radiometer setup to Grid site
    • put in ground control point

New ~mile 60 Kougarok site

  • radiation
  • heat flux
  • put in ground control point