2016 NGEE August Nome Trip
Revision as of 14:53, 25 July 2016 by 137.229.92.213 (talk)
Second Trip:
August 11 - 19
Second Trip To Do List:
- @ Teller
- Lower Station turn into full met 3m tripod located closer to shrubs
- soil pit
- 1.5m soil temps?
- snow
- radiation
- probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)
- airtemp & Precip
- 3m anemometer
- use self tapping screw to keep animals from removing precip bucket lid.
- Upper station
- soil pit in the low area
- new solar panel
- real batteries in a battery box
- super animal protection.
- Lower Station turn into full met 3m tripod located closer to shrubs
- @ Kougraok M64
- if we get permission then site at the top perhaps?
- Existing Sites @ Kougarok
- Remove lowest section of K-met Tower?
- Level radiometers
- level precip buckets
- general sensor refresh
- Existing Sites @ Council
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- level precip buckets
- general sensor refresh
- spend one or two nights with Mike Murphy to reduce travel times?
- radiometer setup to Grid site
- put in ground control point
New ~mile 60 Kougarok site
- radiation
- heat flux
- put in ground control point
8/11
- Arrive @ around Noon
- Pick up vehicle
- Pick up freight
- Visit Anvil Mountain and swap out batteries.
- Get groceries
- Pack vehicle for 8/12
8/12
- Go to Teller
- @Top Put up permanent site
- tripod
- batteries
- battery box
- solar panel
- logger
- radiometer
- additional box for multiplexer
- multiplexer
- Met Sensors
- AT/RH
- RM Young WS/WD
- Snow Depth
- Precipitation?
- Soil Pit
- SDI12 Soil Moisture
- Soil Thermal Conductivity
- Heat Flux Plate
- Cable Armoring for everything exposed
- Reuse for SW station:
- small battery
- small solar panel
- CR800
- @ SW station
- Move instrument box to the small stand