2016 NGEE August Nome Trip
Contents
Second Trip:
August 11 - 19
pre trip
find large wrenches to bring for drill bits
To Purchase
- 5 more dog anchors
- 2.5" unistrut clamps (for
- crimping tool
- white duct tape
Second Trip To Do List:
- @ Teller
- Teller Lower Station turn into full met 3m tripod located closer to shrubs
- soil pit
- 1.5m soil temps?
- 2x snow
- radiation
- probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)
- airtemp & Precip
- 3m anemometer
- use self tapping screw to keep animals from removing precip bucket lid.
- Surface Water Station #1
- Bring out CR200
- Connect two Pressure Transducers to this CR200
- Readdress them to 1 & 0 from 0 & 0
- Perhaps use battery from upper site...
- Teller Upper Station
- soil pit in the low area
- new solar panel
- real batteries in a battery box
- perhaps battery box located in iarc 106.
- super animal protection.
- Survey in and place the two hobo pressure transducers somewhere in the watershed up stream from the main site.
- Teller Lower Station turn into full met 3m tripod located closer to shrubs
- @ Kougraok M64
- if we get permission then site at the top perhaps?
- If no permission then adjacent to the GIPL Pilgrim site.
- Existing Sites @ Kougarok
- Remove lowest section of K-met Tower?
- Level radiometers
- level precip buckets
- general sensor refresh
- Existing Sites @ Council
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- level precip buckets
- general sensor refresh
- spend one or two nights with Mike Murphy to reduce travel times?
- radiometer setup to Grid site
- put in ground control point
New ~mile 60 Kougarok site
- radiation
- heat flux
- put in ground control point
8/11
- Arrive @ around Noon
- Pick up vehicle
- Pick up freight
- Visit Anvil Mountain and swap out batteries.
- Get groceries
- Pack vehicle for 8/12
- Pick up freight
- bring teller coded gear to Bering Air
8/12 & 8/13
(I think this may take more than two days)
Starting to think 1.5 -2 days per site is more realistic
- Go to Teller
- @Top Put up permanent site
- tripod
- camera
- batteries
- battery box
- solar panel
- logger
- radiometer
- additional box for multiplexer
- multiplexer
- Met Sensors
- AT/RH
- RM Young WS/WD
- Snow Depth
- Precipitation?
- Soil Pit
- SDI12 Soil Moisture
- Soil Heat Capacity
- Heat Flux Plate
- 1.5m Soil temperature?
- Cable Armoring for everything exposed
- Reuse for SW station:
- small battery
- small solar panel
- CR800
- @ SW station
- Move instrument box to the small stand
- Reprogram CR800 & power back up. (I'm still torn on doing this this year or next year...)
- @ Snowmelt Logger
- Reuse Snowmelt Yellow box & Logger for permanent site.
- Met Sensors
- AT/RH
- RM Young WS/WD
- Snow Depth
- Soil Pit
- SDI12 Soil Moisture
- Soil Thermal Conductivity
- Heat Flux Plate
- 1.5m Soil temperature?
- tripod
- camera
- batteries
- battery box
- solar panel
- Cable Armoring for everything exposed
- Use Survey GPS to lock in positions of all instrumentation (before move and after!)
- Make a discharge measurement
- Level precip bucket
- Bring a drill & self-tapping screw to lock tipping bucket in place.
8/14 - 8/16
- FUEL UP!!!!
- If the weather cooperates, hike up and visit the Kigluaiks Sites
- optional, cancel if behind schedule...
- download data
- reorient antenna if needed
- see if there is anything we can take down from the smashed up site
- Plan A: Recon the Kougarok site
- Plan B: save Kougarok_m64 site for '17 or put instruments @ Pilgrim hot springs
- @Kougarok_m64
- tripod
- still mulling this one since we will be dragging all this stuff up the hill.
- batteries
- battery enclosure
- Met Instruments
- AT/RH
- Precip?
- RM Young WS/WD
- Snow Depth
- Soil Pit
- SDI12 Soil Moisture
- Soil Thermal Conductivity
- Heat Flux Plate
- 1.5m Soil temperature?
- tripod
- what am I forgetting here?
- @ K2 Met
- Lower the tower to two sections
- grab data off the storage module
- sensor refresh
- AT/RH
- SR50A
- Battery
- better secure the radiation stand to make sure it stays level.
- @ K3 Mauze Gulch
- Sensor refresh
- AT/RH
- SR50A
- Battery?
- Data Download
- Sensor refresh
- @ K1 SR50A refresh if time allows
- Camping Schedule
- 8/14: Salmon Lake BLM
- 8/15: Kougarok Cabin
- 8/16: Kougarok Cabin
8/17 - 8/18
- Drive back to Nome and on to Council
- Spend two nights @ B&B.
- Focus on C2 Blueberry site & Tower.
- make the radiation stand more solid.
- Lower the tower to 2 sections
To bring MISC
- anti seize goop
- camping gear
VATP notes
- bringing 2 drill bits (different tips), two extensions (different lengths), and two connectors
- also need to bring wrenches
- drill in UAF Nome storage
- when installing VATP, remove upper veg layer, drill a hole, install VATP, cut a slit in upper layer to place back around installed probe
Anemometer notes
Testing each anemometer for
- propeller torque using anemometer torque disc (18310)
- factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)
- 33821 moved with 0.2 gm-cm (a black nylon screw at 2cm radius), so this is much better than factory spec
- 61996 moved with 0.5 gm-cm
- tested both Clock Wise(CW) and Counter Clock Wise (CCW)
- factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)
- Wind speed using anemometer drive (18802)
- @200rpm = 0.98m/s. @1000rpm = 4.9m/s. @2000rpm = 9.8m/s
- tested both CW and CCW
- Vane Torque using Vane Torque Gauge (18331)
- mount the gauge, pull the string, if it moves with < 30 gm-cm of torque, golden.
- tested both CW and CCW
- Wind Direction using Vane Angle Fixture Tower Mount (18212)
- checked 3 directions
- 33821 all within 1 degree of accuracy
- 61996 reads 3 degrees less (ex: reads 177 when should be 180)
- checked 3 directions
NEED ONE WIRE (have one)