2016 NGEE September Nome Trip
Contents
Fairbanks
To Buy:
- machine screws for sat transceiver
Teller Bottom @ TL_DS_1
To Do:
- Get Thermal Conductivity sensors running
- Jumper for batteries
- Pack up Surface Water Station for winter
- Duct seal up all instrument box holes
- Final Discharge Measurement of season
- serial numbers
In Nome Storage:
- jumpers for last battery
- soil sampling cylinders for soil pit
- Cable spools for Pressure transducers
- wading rod & cloth tape for discharge measurement
At Site
- duct seal for all connections
- soil pit sensors in large actionpacker
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
Left to fix
- Decagon SRS sensors... test again in Fairbanks
- Thermal Conductivity sensors... figure out their deal...
- Check out the wiring. Specifically, the original program guidance has a typo
- VX3 should be wired to SE11 but program says to SE12. (maybe... in any case, double-check)
- I have a single working here measuring temperature properly.
- Review fieldbook
Teller Top @ TL_IS5
Remaining To Do for fall
- Bring out a charge controller for solar panel
- soil samples from soil pit
- soil pit sensors are in a large actionpacker next to tower.
Kougarok M64
- Add ground control survey point if permitted
Skookum Pass
- Add Satellite Components
Kougarok Old Sites
- Download data over the radio network
Council Old Sites
- Look for camera at Blueberry site
- replace antenna & coax @ blueberry site