SS Site Visit 2018-08-01
Revision as of 12:52, 1 August 2018 by 137.229.18.212 (talk) (Created page with "* pounded in grounding rods * pounded in tower screed stakes * replaced all tower blowers for AT/RH ** didn't change the forest floor one ** it needs to be soldered to its pow...")
- pounded in grounding rods
- pounded in tower screed stakes
- replaced all tower blowers for AT/RH
- didn't change the forest floor one
- it needs to be soldered to its power cable but the old one is still functional, too.
- added a second vent in the shed and left a fan running inside the shed