SS Site Visit 2018-08-01
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
- pounded in grounding rods
 - pounded in tower screed stakes
 - replaced all tower blowers for AT/RH
- didn't change the forest floor one
 - it needs to be soldered to its power cable but the old one is still functional, too.
 
 - added a second vent in the shed and left a fan running inside the shed