Bob Busey NGEE Arctic Barrow Book 2
Revision as of 14:04, 14 February 2019 by 172.18.0.1 (talk) (Created page with "(This book is incomplete. Look for data in spreadsheets) ===4/24/2014=== * @ Site A ** Replaced 1.4m AT/RH *** removed: J0320039 *** replaced w/: K0810043 ** releveled net r...")
(This book is incomplete. Look for data in spreadsheets)
Contents
4/24/2014
- @ Site A
- Replaced 1.4m AT/RH
- removed: J0320039
- replaced w/: K0810043
- releveled net rad and replaced desiccant
- data looks good post swap out
- I think AT broken is corrosion related
- Replaced 1.4m AT/RH
- @ Site B
- Replaced 3.5m AT/RH
- removed J0320033
- replaced w/ K0810046
- Net Radiatiometer screws oxidized in place. need more corrosion protection.
- 4/24/2014 1:00 CNR4 swap. Put out S/N 121081
- SW Upper 15.07
- SW Lower 15.75
- LW Upper 8.05
- LW Lower 7.46
- all replaced instruments look good
- Replaced 3.5m AT/RH
- @ Site C
- Couldn't open net radiometer box so left in Barrow
- @ Site D
- Replaced Desiccant
- D Thermal Conductivity Heaters
- 1 68.2 Ohms
- 2 70.2 Ohms
- 3 70.4 Ohms
- 4 70.7 Ohms
- 5 69.1 Ohms
- 6 70.3 Ohms
- D Thermal conductivity resistance
- 1 57.6 kohm
- 2 57.8 kohm
- 3 58.2 kohm
- 4 57.5 kohm
- 5 58.0 kohm
- 6 58.38 kohm
- I think there must be a program problem w/ thermal conductivity @ D so checking into that.
8/12/2014
To Barrow:
- CNR4 Radiometer 120965
- one desiccant for --^
- cable management supplies
- volt meter
- 8 snow sensors
#7 - s/n 2012 #7 - s/n 1439 #7 - s/n 3527 #8 - s/n 4516 #7 - s/n 2901 #8 - s/n 3969 #8 - s/n 3538 #9 - s/n 3544
- drill & battery
- keypad
- duct tape
- toughbook & charger
- serial cable
- new & old fieldbook
- 6/32 tap & die
- toolbags
- electrical tape
- usb wifi
8/21/2014
- @ Site A
- A trough snow sensor too corroded for sensor swap
- Level Net Rad (it was close)
- level precip bucket (also looked close to level)
- corrosion goo to net rad screws & connections
- tools used:
- 5/16" nut driver (precip)
- torpedo level (precip)
- 1/2" nut driver (snow)
- flathead screwdriver w/ 1/4" nut driver (snow)
- channel locks (snow)
- phillips screwdriver (snow)
- @ Site B
- leveled Net Rad
- Swap back original Net Rad
- Corrosion Protection
- Level Precip (way off)
- change snow trans
- @ Site C
- Like A trough, C trough snow sensor to corroded to totally remove so swapping just transducer
- Precip still level
- Net Rad Leveled
- 1 screw stripped
- anti corrosion goo on WS & Net Rad
- changed desiccant
- @ Site D
- Changed net rad desiccant and leveled
- swapped snow sensor 2901
- think I have the TC probes fixed. double check resistors are correct.
- TC 1 26.01 kOhms
- TC 2 28.82 kOHms
- TC 3 32.59 kOhms
- TC 4 23.76 kOhms
- TC 5 28.35 kOhms
- TC 6 30.96 kOhms
- Logger says maybe:
- 1 11.35 kOhms
- 2 11.40 kOhms
- 3 11.51 kOhms
- 4 11.26 kOhms
- 5 11.39 kOhms
- 6 11.45 kOhms
=Snow Sensor in memor reset of snow depth offsets
- A SR50A1 = 182.1
- A SR50A2 = 126.75
- C SR50A1 = left as programmed
- C SR50A2 = 115.0
- C SR50A3 = 117.3
- D SR50A1 = 159.7
Just changed in the memory.
General Comments
I think A & C precip are probably the highest quality.
C net rad will need a swap out for the frozen corroded screw next time up.
Averaged 30 minutes per site.
Ended up not having access to a wheelbarrow
6/24/0215
- Set up over CP8 for survey of IR camera. Took points starting with one but skipped 8 by accident. Used hands & Belly for thermal marker.
- added CFM100 to A but not SM Probe yet.
- changed raspi for dreamplpug.
- ser2net not cooperating not sure the deal. Iused the old usb to send so today changing it over.
- need to trackdown tool-wise:
- yellow snipper
- crimping tool
- small channel lock
4/3/2016
Teller Basin
Upper left Upper Right 2 1 5 4 3
T24 64.7307 N 165.943061 W Day 1 landing transect MM27 = 64.72692 W165.94027 Map stuff for Teller
4/4/2016
CJW & BB & BB 11:50 am DST Departure @ Teller Back a bit after 8pm
4/5/2016
38.5, 38.25, 38.5 measured to blue bumper point off of grid # 8 nrtel8bs 7180048.627m 454031.405m 201.143m Rover base of R8 @ 97.5" then 49.5" on pole
4/7/2016
Still @ nrtel8bs tripod staff. still level distance to bumper still 38.5cm 38.25, 38.5 rover @ 19 in + 124 = 73.5 in @ base of R8
4/8/2016
tlrbcp01 (illegible. something like made travel to arrow) base tripod @ 39" need to identify still
4/10/2016
3' screed stake @ tlrbcp01 pounded to almost ground surface wood stake marks the spot 2' screed stake @ tlrbcp02 short wooden stake marks 2.
- Things left in UAF storage in Nome
- Sledge Hammer
- hose clamps
- shovel - black
- 4 pipes 1-2 in diamter
- breaker bar
- metal tie on labels
- key to shotgun
- Things left @ NGEE storage in Nome
- surveying poles
- yellow dry survival bag
- shotgun
- drill case (drill, charger, bit)
- staff gauges
- shovel
- blue cushion
- snow laser poles
- thaw probe
- survey poles
- chair
- skis of magic variety
- caps for rebar - orange
- avi probe
- red shovel
- instrument cables
- 2 boxes for HMP155 and CNR4s + 1 SR50A box
- Hammer
- some hardware?
- ubolts
- 25 gauge steel wire
- emergency pot
- tripods for cameras
- steel conduit ~1m length x3
- solar panel
- reels for PTs
- orange flags
- caribiner
- campbell screwdrivers
- european terminal strips
Barrow
[sketch of A/B/C/D and location of control points] CP04 E585902.700 H=5.804 N 7910286.133 N71 16' 46.62055" W156 36' 4.89882" H 2.937m
- ToDo:
- Call bering Air - find helmet & bag
- survey tripod from conex