2022 NGEE Nome October Trip
Contents
- 1 Pre Trip Data Review
- 2 Items for October Trip
- 2.1 In Anchorage general supply
- 2.2 In UAF connex
- 2.3 Things to grab in Fairbanks yet
- 2.4 To Buy yet
- 2.5 Nome Conex Instrument Inventory (May 2022 Edition)
- 2.6 Older Note to follow up on: Teller bottom 2022-05-20
- 2.7 Teller IS2 Snow
- 2.8 Teller 47
- 2.9 Teller 47 Snow
- 2.10 Teller Top
- 2.11 Anvil
- 2.12 Snow Stand Improvements
- 3 Proposed Itinerary
Pre Trip Data Review
- KG IS5 Snow: WS/AT good
- KG Trans9 Snow: WS/AT good
- KG m64 Met:
- Swap Barometric Pressure and fix the vent tube.
- Teller Bottom
- Data download: regrab file 165.dat series. (5/22 to 6/5)
- Teller SW
- Data all good but refresh desiccant
- Take a minute to sort out if the 0 values in the snow sensor time series are from the bushes interfering with the signal before replacing sensor.
- Teller Top
- Not visited since March...
- Teller m47
Items for October Trip
In Anchorage general supply
- SC932?
- Radio? (plan B could be use the radio for calling kougarok sites)
In UAF connex
- Sledge hammer for snow stand anchors
- pipe wrench for snow stand achor removal (if necessary)
- ladder
- car safety kit
- extra fuel (for later in trip)
- bear spray
- foot driers
- spare cabling for Teller Top
- Replacement pressure sensor for Kougarok hill
- 2 spare HMP155s
- 2 CNR4s for Teller top & bottom
- cable protection for Teller IS2
- cable protection for Kougarok Trans9
- Spare SR50A for Teller IS2 meadow / Teller m47 willows
Things to grab in Fairbanks yet
- @ room 106 a charge controller for IS2 snow site
- @ room 207B: Pressure transducer 2 desiccant holder.
- @ room 207B: SC932A?
- @ Cabin: Another anchor or two / wire rope for snow stands year 2
- XX CR1000 for Teller IS2 Snow
- XX Drill
- XX Sawzall
- flat plate of some sort for under IS2 bases (optionally: trail mat?)
To Buy yet
- Mineral / Baby Oil
- Ford Funnel
- Pruning shears
- 2 Dog anchors for Teller IS2 Meadow
- 3/16" cable clamps
- another short step stool / ladder
- TL-IS2 Snow Depth Stand 10ft pipe
- 3/4 in x 10 ft pipe
- 3/4" Box wrench
- 1/4" Allen Wrench
- XX machine screws (looks up size from the tap & die I have... also maybe buy a couple more bits) (for cnr4 radiometers)
- Battery box lid rope / twine / nrs strap.
- For the snow sites:
- Guy wire
- cable clamps
- screed stake / dog anchor
- ngee m64: the pvc pipe to use for keeping pressure sensor accurate over the winter
Nome Conex Instrument Inventory (May 2022 Edition)
- Left 2 HMP155s in Nome Conex
- Left 1 SR50A in Nome Conex
- Left 1 BP Sensor in Nome Conex
- Left 2 anemometers in Nome Conext
Older Note to follow up on: Teller bottom 2022-05-20
- Problem files
- Micromet110.dat
- Mm112
Teller IS2 Snow
- Need a base plate for 4x4 to keep it from sinking further into muck. That turns out to be the source/reason for the lean.
- Limited Lean 5/22/22 by pounding in rebar with guy wire anchor. Could use rebar cap from storage for it (or from Fairbanks)
- Also on 5/22/22: Verified voltage of solar panel and battery. Charge controller needs replacement
Teller 47
- Guy wire off again creek side
- Baud rate on md485 set to 9600. I always forget so might need to adjust serial port speed before collecting here
- Should really buy a couple of the rs232 cables for the cr6 cas sites
- Should look at pressure data here and compare to teller bottom.
- There are flies in the vent and it should be replaced
- I think we have a baby oil in conex for fall 2022 geonor.
Teller 47 Snow
- Vertical pipe bent a bit over the winter.
- If available, use spare SR50A here
- need to take down station so might need ladder (we've brought up in past)
- pipe wrench
- sledge hammer
Teller Top
Tasks
- Bring up HMP155 cable from nome conex and replace cable
- Need rubber splicing tape
- electrical tape
- Recalibrated CNR4 from conex
- might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated)
- Musk Ox within 50 meters of station prevented a visit.
- SR50A transducer replacement
Anvil
- Look at replacing radio / SC932A
Snow Stand Improvements
- Shipped out in March parts to add a snow depth side diagonal support (just need to buy the pipe).
- Teller 47 snow
- KG-IS5 snow
- Teller IS2 2x
- Should also add back side guy wires to:
- Teller IS2 2x
- Teller 47 snow
- KG-IS5 Snow 2x
Proposed Itinerary
Day 1 Sunday
- Arrive on evening flight
- Pick up Truck.
- Grocery for perishables and local snacks
- XX Swing through campus and look at the radio base station antenna
- Should get access to the building to look at it indoors this trip though...
- if weather cooperative / time allows visit anvil otherwise squeeze in early in trip.
Day 2
- Drive to Teller 27
- Gage the Creek
- Download data from all sites at bottom
- Replace radiometer at Teller Bottom
- Replace snow transducers on reachable systems
- Fix Tipping bucket
- Teller Bottom Soil Moisture sensor need a bit of attention. No SDI 12 action.
- Bring out step ladder for Teller Bottom CNR4
- Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download).
- Teller sw could use one serial cable
Day 3
- Visit Kougarok sites
- Replace pressure sensor at met station
- m64 met: relevel cnr4 & tipping bucket
- Snipped the pressure vent tube but thinking I should return with something more. Like pvc pipe going to ground so there is even less chance of clogging. Like could add the T sections of drill holes in pipe for venting
- Kg is5 snow
- Replace battery box lid
- Could use a sticky hook to hold serial cables up inside these boxes
- KG South Transect Snow
- All good here nothing to change.
Day 4
- Drive to Teller 47 site
- download data
- dump precip bucket
- need baby oil
- level radiometer
- (ordered a replacement SR50A for the willows site. Will need to deploy this trip)
- Drive to teller top
- download data
- HMP155 cable, try redoing the connections inside the instrument box.
- replace CNR4
Day 5
- Leftovers at teller bottom area
Out of date:
- Council
- download data at grid and level tipping bucket
- disconnect radio?
- check battery voltage in 21/22 winter.
- Visit Skookum and check out antenna / radio
Day 6
- Wrap up loose ends in town
- Return home on morning flight