Sept 2008 Field Trip - Emily and Ken
Revision as of 09:38, 20 August 2008 by 137.229.71.46 (talk)
Ken add stations that need conduit and bear fencing.
Note: Sites are grouped by area.
Day 1 & 2 West of Dalton Highway (White Hills Area)
1. West Kuparuk met:
- Troubleshoot station
2. DFM4 NW Kuparuk Met DFM4:
- Add Electric Fence
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
3. DFM2 White Hills met Bear Damage:
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
5. DFM1 South White Hills Met (if time)
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
Day 3 and 4 (Bullen Area/Kavik Area)
6. DBM7 Kadleroshilik Met DBM7 Snow Sensor:
- Check net radiometer - readings went bad after we left the site
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
7. DBM8 Bullen Met DBM8
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
9. DBM5 Upper Kad Met DBM5:
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
- Add E-Fence???
10. DBM6 Kavik Met:
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
Day 5 & 6 (Mountain Sites)
11. DBM3 Juniper Met DBM3
- North fence needs another post,
- solar panel wires are exposed, needs "plates" or other protection
- install conduit
- Swap HMP45C
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
12. DBM1 Accomplishment Cr Met DBM1 (if time)
- Swap HMP45C
- install conduit if time permits
- install solar panel plate (larger size)
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area
13. DBM2 Ribdon Cr Met DBM2 (if time)
- Swap HMP45C
- install conduit
- Add bark chips
- Measure distance from ground to snow sensor
- Take photos of site and snow sensor area