Sept 2008 Field Trip - Emily and Ken

From IARC 207 Wiki
Revision as of 09:38, 20 August 2008 by 137.229.71.46 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Ken add stations that need conduit and bear fencing.


Note: Sites are grouped by area.

Day 1 & 2 West of Dalton Highway (White Hills Area)

1. West Kuparuk met:

  • Troubleshoot station

2. DFM4 NW Kuparuk Met DFM4:

  • Add Electric Fence
  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

3. DFM2 White Hills met Bear Damage:

  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

4. DFM3 North White Hills Met

  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

5. DFM1 South White Hills Met (if time)

  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

Day 3 and 4 (Bullen Area/Kavik Area)

6. DBM7 Kadleroshilik Met DBM7 Snow Sensor:

  • Check net radiometer - readings went bad after we left the site
  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

7. DBM8 Bullen Met DBM8

  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

9. DBM5 Upper Kad Met DBM5:

  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area
  • Add E-Fence???

10. DBM6 Kavik Met:

  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

Day 5 & 6 (Mountain Sites)

11. DBM3 Juniper Met DBM3

  • North fence needs another post,
  • solar panel wires are exposed, needs "plates" or other protection
  • install conduit
  • Swap HMP45C
  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

12. DBM1 Accomplishment Cr Met DBM1 (if time)

  • Swap HMP45C
  • install conduit if time permits
  • install solar panel plate (larger size)
  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area

13. DBM2 Ribdon Cr Met DBM2 (if time)

  • Swap HMP45C
  • install conduit
  • Add bark chips
  • Measure distance from ground to snow sensor
  • Take photos of site and snow sensor area