Gcl
Jump to navigation
Jump to search
Contents
Green Cabin Lake
TODO list
site logs
12 July 2007, Ken I.
- install RM Young on cross-arm mount
- mounted 2m above ground
- s/n 69248
- WS on P1, location 2
- WD on SE2, E2, loc 7
- electric fence in good shape, working
- NOTE: top mast is not 1-1/4" pipe -- probably electrical tubing of similar O.D., but slightly smaller (typical other HW sites)
7 June 2007, Ken I., Dan R.
- installed electric fence with 4 posts
- checked logger (OK) using keypad
- poured water into rain gauge (OK); precip record at 1635 AKST (and
hourly total) should be ignored as data (in post-processing)
- wx: warm wind from SSE, about 15 to 20 knots. Dry, no rain.
- measured tripod/stand mast riser at 1-1/2" diameter (needed for
cross-arm mount)