NGEE June 2015 Barrow
Jump to navigation
Jump to search
Group work:
- Place soil moisture sensors at sites A-D
- survey extents of IR & optical image
- was there a soil moisture transect in the DTLB?
For me (work in progress):
- reprogram data loggers to add additional soil moisture sensors and snow quality number
- add extended memory to ngee data loggers
- cover screed stake guy wire anchors
- ship remaining items in storage back to Fairbanks
- kill-a-watt to see total draw of camera plus beacon
- ??maybe install some sensors for Shawn Serbin??
Monday:
- pick up screed stake fall protection
- verify logger programs
- to A,B,C,D
- add CF module output instructions
- add quality number to snow data table and snow SDI measurement instruction
SDI12Recorder (sr50a(),3,7,"M1!",1.0,0)
- add program instructions for hydraprobes & put data into new tables
- In addition, need to
- ?? copy iptables rules to raspberry pi?? (think we're golden on this)
- connect CC5mpx to CR1000
- set up USR drive
- figure out how to reconfigure IP using cora commands.
- connect localhost; set-device-setting IPPort_4 comPortID ralph.iarc.uaf.edu:78; quit;
- camera keeps resetting tilt angle to point at the ground. Might look into that...
- looks like I already have a tilt instruction included in the cgi:
https://garbage:password@192.168.1.3/axis-cgi/com/ptz.cgi?pan=160&tilt=0&zoom=0 http://www.wowza.com/forums/showthread.php?10430-Looking-for-AXIS-PTZ-Control
Manuals to download:
- CC5mpix
- CFM100
To Bring:
- Survey rod
- survey gps
- soil moisture probes
- aluminum pipe wrench
- battery box for tower backp
- battery charger for tower
- to bring home no matter what
- tool bags
- radiometers (what was this...) oh, maybe radiometer mount?
- survey rod
- to bring up next time:
- update program for SM sensor... perhaps...
- update config to get images off CC5mpix downloading to Fairbanks
- look at sdi12 for getting more than 10 sensors on a control port.
- catch up with Shawn Serbin and his NDVI sensors.
- rebar protection for screed stakes
- start looking at screed stake removal... maybe do a test with the pipe wrench / bring a pipe up for