Difference between revisions of "NGEE"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | ===Safety=== | ||
+ | * Before every trip be sure to submit a Field Emergency Plan to your director & travel coordinator. | ||
+ | * Also update the field supplemental as needed. | ||
+ | * Annually, review the NGEE team safety document. Find it online: | ||
+ | ** http://ngee-arctic.ornl.gov/sites/default/files/ngee_project_field_safety_manual_rev_2016V6.pdf | ||
+ | ** http://ngee-arctic.ornl.gov/ngee-safety | ||
+ | |||
===Notes=== | ===Notes=== | ||
* https://ngee-arctic.atlassian.net/wiki/display/MOD/NGEE-Arctic+Modeling+Home | * https://ngee-arctic.atlassian.net/wiki/display/MOD/NGEE-Arctic+Modeling+Home | ||
Line 28: | Line 35: | ||
* Timezone - UTC | * Timezone - UTC | ||
* PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403 | * PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403 | ||
+ | |||
+ | |||
====Lists==== | ====Lists==== | ||
* [[Guruplug Setup]] | * [[Guruplug Setup]] |
Revision as of 10:55, 11 July 2016
Contents
Safety
- Before every trip be sure to submit a Field Emergency Plan to your director & travel coordinator.
- Also update the field supplemental as needed.
- Annually, review the NGEE team safety document. Find it online:
Notes
- https://ngee-arctic.atlassian.net/wiki/display/MOD/NGEE-Arctic+Modeling+Home
- NGEE Barrow Intensive Sites Initial Wiring
- Programs:
- NGEE Site A Instrumentation History
- NGEE Site B Instrumentation History
- NGEE Site C Instrumentation History
- NGEE Site D Instrumentation History
- NGEE Data Log Record
- NGEE Backup Instrumentation
- Several Important Network Devices
- NGEE-Barrow Manual QA Notes
- NGEE-Nome Sites
- NGEE-Barrow Telemetry Testing
- NGEE Data Archive Direct Links
- NGEE Download ARM Data
- NGEE Barrow Computer Network Links
- NGEE Seward Survey Notes
Metadata type stuff
- NGEE Data Archive Direct Links
- Snake River observations from the NWS:
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
Lists
Trips
- NGEE April 11 2012 Trip
- NGEE September 3 2012 Trip
- NGEE September 24 2012 Trip
- NGEE Barrow Wiring Layout
- NGEE Barrow Intensive Sites Initial Wiring
- NGEE Barrow 2013 Boring Trip
- [NGEE Barrow 2013 Site Install Trip 5/7
- NGEE Barrow 2013 Site Install Trip June
- NGEE Barrow 2013 Site D Install Trip August 2013
- March 2014 Barrow
- August 2014 Barrow
- NGEE December 2014 Barrow
- NGEE May 2015 Barrow
- NGEE June 2015 Barrow
- NGEE July 2015 Nome
- NGEE August 2015 Barrow
- NGEE September 2015 Barrow
- NGEE September 2015 Nome
- NGEE Barrow Remainder Items
- NGEE Spring 2016
- NGEE Barrow April 2016
- NGEE Nome April 2016 pt 1
- NGEE Nome April 2016 pt2
- CPCRW 2012-10-12
- CPCRW 2013-07-15